Tuesday, 23 June 2009

Earthwork, Retaining Wall Completed

The earthworks and building of retaining wall all around the site of Rumah Aman 2 has been completed.

The completed retaining wall at the back measures 27 meters long and 4.5 meters high whilst the retaining wall by the side measures 65 meters long and 6 meters high.

The extended retaining wall at the front of the site was completed this week. It measures 37 meters long and 2 meters high.

We hope when Rumah Aman 2 is ready we will be able to care for 60 orphaned and poor boys and help them shape a better future for themselves and their family members, however, we cannot do this by ourselves, we will need continuous assistance from the public to make this dream a success.

Pictures from top :

1. Completed retaining wall at the side of the area viewed from Jalan Seroja 1/1A.

2. Extended retaining wall near the entrance to the site viewed from Jalan Seroja 1/1.

3. The earth that has been leveled.

4. Extended retaining wall viewed from the junction of Jalan Seroja 1/1 and Jalan Seroja 1/1A.

5. The entrance to Rumah Aman 2 building site.

6. Completed retaining wall at the back area.





No comments: